It exchanged from the NORMAL Pump simultaneously with formation of an 85-cc Bore up, and strengthening Clutch introduction.Since the futility of the three 2 times time-and-effort time and effort of work [ a direction ] or an Oil introduced simultaneously with them since it is necessary to remove the
Clutch or to remove a Cylinder for Orifice processing was excluded, I thought that it was good.Since
Orifice processing only expands a little existing hole, it attaches a Drill to a Pin vise and can expand it easily only by making it rotate by hand.Therefore, it is not necessary to remove a Stud bolt.It expanded to 1.4 mm this time.If generation of heat by a Bore up is considered as the
Manufacturer also recommends, I will think whether it is safer to carry out strengthening of an Oil pump.
상세 보기